Client: MUNICIPALITY OF ZAKINTHOS
Budget: €4,500,000
Description: New, 2-storey (1 basement – 2 floors) building with a total area of 3600 m2. It consists of reinforced concrete and steel & composite components. Raft foundation is used supported on piles. Bored piles walls are used for retaining. Detail design.