Client: UNIVERSITY OF PATRAS
Budget: €11,000,000
Description: A new 5 storey building consisting of six structurally independent RC structures of a total area of 8,800 m2. Stiff strip footing is used. Preliminary design.
Client: UNIVERSITY OF AGEAN
Budget: €16,000,000
Description: RC Building with basement floor and upper floors from precast concrete. Detail Design.
Client: UNIVERSITY OF AEGEAN
Budget: €10,000,000
Description: Four new 4-storey RC buildings of a total area of 8,000 m2. High water table level. Raft foundation is used. “Design - construction” scheme. Final design.
Client: MUNICIPALITY OF ANO LIOSIA
Budget: €6,000,000
Description: A new 4-storey RC building consisting of two structurally independent structures with of a total area of 5,000 m2. Improvement of the soil conditions with a sanitary layer of 1m depth. Raft foundation is used. Final & detail design.
Client: MUNICIPALITY OF ANO LIOSIA
Budget: €6,000,000
Description: A new 4-storey RC building consisting of two structurally independent structures with of a total area of 5,000 m2. Improvement of the soil conditions with a sanitary layer of 1m depth was performed. Raft foundation is used. Final & detail design.
Client: MUNICIPALITY OF RAFINA
Budget: €6,000,000
Description: A new 3-storey building consisting from four structurally independent structures with wooden roofs and secondary steel frames of a total area of 3,500 m2. The foundation system used is individual footings interconnected by beams. Design and construction scheme. Final and detail design.
Client: MUNICIPALITY OF PERAMA
Budget: €5,000,000
Description: A new 4-storey RC building of a total area of 1,500 m2. Strip foundation is used. Final & detail design. Retaining trench excavation using “Berlin” wall. Design and construction scheme. Final design
Client: REGION OF ATTICCA – COMMUNITY OF ANAVYSSOS
Budget: €1,350,000
Description: A New 3-storey RC building of a total area of 1,000 m2. Construction of a sanitary layer due to the high water table. Raft foundation is used. Design and construction scheme. Final design.
Client: ORGANIZATION OF SCHOOL BUILDINGS
Budget: €6,000,000
Description: A new 2-storey RC building consisting of two structurally independent structures with of a total area of 4,000 m2. Raft foundation is used. Design and construction scheme. Final & detail design.
Client: MUNICIPALITY OF ANO LIOSIA
Budget: €7,000,000
Description: A New 3-storey RC building consisting of two structurally independent structures with a total area of 6,000 m2. Strip foundation is used. Final & detail design.
Liontos & Associates Ltd was established in 1998, having as an objective to provide consulting services regarding the design and management of complex technical projects. Since its establishment, the company has completed numerous projects of multiple disciplines, such as structural, geotechnical and transportation.
The company has developed and is currently applying a Quality Management System which is in accordance to the specifications set in EN ISO9001:2008 for Design, Supervision and Management of Civil Projects, as certified by the EQA HELLAS Certification Body.
Our team has extensive experience and high expertise across all significant areas of civil and structural engineering. Our firm’s goal is to provide complete technical solutions that fulfill the needs of each project in accordance with the latest design standards. As a highly motivated company with passion for improvement, Liontos & AssociatesLtd has extended its professional activity beyond the Greek market, by undertaking several projects in countries of Eastern Europe and Middle East.
Our advanced qualification and expertise have been developed along the following fields:
3, CHIRONOS str.,
GR 144 51 ATHENS-GREECE
ΤEL: +30 210 6411406
FAX: +30 210 6432075
info@liontos.gr