Client: MUNICIPALITY OF KORIDALOS
Budget: €5,000,000
Description: Three new 4-storey buildings with a total area of 2,800 m2. It is a composite structure with basement floors made from reinforced concrete and over-ground floors made from structural steel. “Design – construction” scheme. Final Design.