Client: MUNICIPALITY OF VIRONA
Budget: €5,000,000
Description: A new 4-storey building consisting of two structurally independent RC structures of a total area of 3,700 m2. A closed gym center and a multifunction hall area and a steel curved truss roof of a total area of 1,200 m2. Improvement of the soil conditions with a sanitary layer. Strip foundation is used. “Design - construction” scheme. Final design.