Client: PUBLIC CONSTRUCTION CORPORATION FOR MEDICAL INSTITUTIONS
Budget: €1,500,000
Description: Structural assessment of the central part of the existing hospital and replacement with a new 6-storey RC building of a total area of 2,500 m2 together with several secondary steel structures. Final and detail design.