Client: MINISTRY OF CULTURE, GENERAL SECRETERY FOR ATHLETICISM
Budget: €9,000,000
Description:
a) A new RC 3-storey building (1 basement – 2 floors) and secondary steel structures. Strip foundation is used. The total area is 2.000 m2.
b) Renovation works for the existing grandstand and structural assessment of an existing building. Final & Detail design.