Nov
16

Two High School Buildings in Peania

Client: MUNICIPALITY OF PAIANIA
Budget: €3,500,000
Description: Two new bioclimatic RC buildings with wooden roofs of a total area of 2,600m2. Strip foundation is used. Final & detail design.

Nov
16

4th Public Primary School in Lagonisi

Client: MUNICIPALITY OF KALIVIA
Budget: €5,800,000
Description: Four new buildings, with and without basement floors of a total area of 3,900m2. Strip foundation is used. Detail design. 

Nov
16

New Daycare Building for the Muncipality of Galatsi

Client: MUNICIPALITY OF GALATSI
Budget: €2,500,000
Description: Two new 3-storey RC buildings of a total area of 1,800 m2. Strip foundation is used. Design and construction scheme. Final & detail design.

Nov
16

Municipal School “HRAKLITOS”, Addition of a New 4-Storey Building

Client: PREFECTURE OF PIRAEUS – MUNICIPALITY OF NIKEA
Budget: €5,000,000
Description: A new 5-storey building consisting of two structurally independent structures of a total area of 5,000 m2. Strip foundation is used. Design and construction scheme. Final & detail design.

Nov
16

2nd Daycare Nursery Building for the Muncipality of Mandras

Client: MUNICIPALITY OF MANDRA
Budget: €2,500,000
Description: A new 3-storey RC building with wooden roofs and secondary structures from structural steel of a total area of 1,600m2. Strip foundation is used. Design and construction scheme. Final design.

Nov
16

High School in Polygyros

Client: AGENCY OF SCHOOL BUILDINGS – PREFECTURE OF CHALKIDIKI
Budget: €7,000,000
Description: Four new structurally independent 3-storey RC buildings with wooden roofs of a total area of 5,700 m2. Strip foundation is used. Detail design

Nov
16

National Technical University of Athens, New Marine Engineering Building

Client: NATIONAL TECHNICAL UNIVERSITY OF ATHENS
Budget: €5,000,000
Description: Four new structurally independent RC buildings and one 3-storey steel building with a total area of 4,000 m2. From those, the three contain basement floor and 8 floor levels and the remaining one consists of  basement and ground floor of a total area of 4,000 m2. Final design

Nov
16

High school Building and a Closed Gym Centre for the Muncipality of Virona

Client: MUNICIPALITY OF VIRONA
Budget: €5,000,000
Description: A new 4-storey building consisting of two structurally independent RC structures of a total area of 3,700 m2. A closed gym center and a multifunction hall area and a steel curved truss roof of a total area of  1,200 m2. Improvement of the soil conditions with a sanitary layer. Strip foundation is used. “Design - construction” scheme. Final design.

Our Company

Liontos & Associates Ltd was established in 1998, having as an objective to provide consulting services regarding the design and management of complex technical projects. Since its establishment, the company has completed numerous projects of multiple disciplines, such as structural, geotechnical and transportation.

The company has developed and is currently applying a Quality Management System which is in accordance to the specifications set in EN ISO9001:2008 for Design, Supervision and Management of Civil Projects, as certified by the EQA HELLAS Certification Body.

Our team has extensive experience and high expertise across all significant areas of civil and structural engineering. Our firm’s goal is to provide complete technical solutions that fulfill the needs of each project in accordance with the latest design standards.  As a highly motivated company with passion for improvement, Liontos & AssociatesLtd has extended its professional activity beyond the Greek market, by undertaking several projects in countries of Eastern Europe and Middle East.

Our advanced qualification and expertise have been developed along the following fields:

  • Structural Design of Buildings
  • Rehabilitation of Historic Structures and Monuments
  • Bridge Design
  • Earth Retaining Structures & Tunnels

Contact

3, CHIRONOS str.,
GR 144 51 ATHENS-GREECE
ΤEL: +30 210 6411406 
FAX: +30 210 6432075 
info@liontos.gr

Visit Us


View Larger Map